Site menu:

Technical Sales: Tracy Lee Once we have received sufficient information, we will provide a quotation within a week. If the quotation is acceptable, We will have a sample made and shipped to required destination. Upon approval of sample, we will have the product made and shipped. The time from acceptance of quotation until receipt of sample is usually 2-4 weeks. The time from approval of sample until receipt of production for the first order is usually 120-150 days.Subsequent orders are usually 70-100 days.

Contact info:
Tracy A. Lee

111 NE 11th Street   Map
Grand Prairie, TX 75050
Tel: (972) 602-1478
Fax: (972) 660-2845
tlee@firstexind.com

Firstex Industries
has expertise in these areas:

Product Links

News from the Import Industry

March 05, 2010

Sintered metal components for autos, motorcycles, machinery

Established in 1978, Kentex Industry Co., Ltd. is a veteran specialist in developing and manufacturing reliable sintered metal components for automobiles, motorcycles, home appliances, machinery etc.

The company supplies a wide range of products, including such as oil pump gears, shock absorber parts, timing gears and pulleys, rotors etc., as well as precision items for electric appliances and general machinery, such as electric and pneumatic power tool parts, bronze and stainless-steel filters etc.

Kentex claims that it is capable of producing sintered items using various materials such as iron, copper, stainless steel, and other alloy, etc., all featuring satisfactory hardness, strength, and anti-pressure capability required by customers.

Source: CENS - Kentex Industry Co., Ltd. - 2010/03/05

[ Back to top ]

Home | Expertise | Inventory | What | Why | Procurement | FAQ | Contact Us | Product Album | Links | News | Site Map

Valid XHTML 1.0 Strict Copyright © 2006 Firstex Industries | Webmaster:Kevin Grey Lee