Site menu:

Technical Sales: Tracy Lee Once we have received sufficient information, we will provide a quotation within a week. If the quotation is acceptable, We will have a sample made and shipped to required destination. Upon approval of sample, we will have the product made and shipped. The time from acceptance of quotation until receipt of sample is usually 2-4 weeks. The time from approval of sample until receipt of production for the first order is usually 120-150 days.Subsequent orders are usually 70-100 days.

Contact info:
Tracy A. Lee

111 NE 11th Street   Map
Grand Prairie, TX 75050
Tel: (972) 602-1478
Fax: (972) 660-2845
tlee@firstexind.com

Firstex Industries
has expertise in these areas:

Product Links

Firstex Industries
has expertise in these areas:

 

Plaster Mold Casting

Introduction

In plaster mold casting, a plaster, usually gypsum or calcium sulfate, is mixed with talc, sand, asbestos, and sodium silicate and water to form a slurry. This slurry is sprayed on the polished surfaces of the pattern halves (usually brass). The slurry sets in less than 15 minutes to form the mold. The mold halves are extracted carefully from the pattern, and then dried in an oven.

The mold halves are carefully assembled, along with the cores. The molten metal is poured in the molds. After the metals cools down, the plaster is broken and the cores washed out.

Parts cast are usually small to medium size, ranging in weight from 30 g (1 oz) to 7 kg (15 lb). The section thickness can be as small as 0.6 mm (0.025 in) and tolerances are 0.2 % linear. The draft allowance is 0.5-1.0 degree. The surface finish is 1.25 µm to 3 µm (50 µin to 125 µin) rms. Low temperature melting materials such as aluminum, copper, magnesium and zinc can be cast using this process. This process is used to make quick prototype parts as well as limited production parts.

 

[ Back to top ]

Home | Expertise | Inventory | What | Why | Procurement | FAQ | Contact Us | Product Album | Links | News | Site Map

Valid XHTML 1.0 Strict Copyright © 2006 Firstex Industries | Webmaster:Kevin Grey Lee